We take the opportunity to introduce Sterling Arch, as one of the Infrastructure development company, which is providing all products related to buildings (Residential and commercial), bridges, malls, multiplexes and all infrastructure development.

FOLLOW US:

Get in touch!

Contact us for any questions or assistance you may need.

308, 309 MSX Tower-1 Alpha-I, Commercial Belt, Greater Noida

Mohali Multi-Story Prefab Building

  • Projects
  • Mohali Multi-Story Prefab Building
Mohali Multi-Story Prefab Building

Project Overview

Sterling Arch has successfully completed a sophisticated multi-story prefab building project in Mohali, Punjab, covering an expansive area of 92,000 square feet. This project reflects our capability to deliver high-quality, durable, and efficient structures within a tight deadline of 120 days.

The building showcases the benefits of prefabricated construction, combining speed, flexibility, and strength. Each component was meticulously designed and assembled to create a cohesive structure that meets modern architectural standards. The building is equipped to serve a variety of purposes, from commercial offices to residential units, and is built to last with minimal maintenance.

Key Features

  • Versatile Design: The 92,000 sq. ft. multi-story building is designed for a range of uses, offering flexible space configurations.
  • Prefabricated Efficiency: Leveraging prefab construction techniques to reduce construction time while maintaining high quality.
  • Durable Construction: Built with robust materials and advanced technology to ensure long-lasting durability.
  • Strategic Location: Located in Mohali, Punjab, a growing urban hub with excellent connectivity and infrastructure.

Project Highlights

  • Rapid Construction: The use of prefabricated elements allowed for a faster construction process, completing the project in just 120 days.
  • Cost-Effective Solutions: Prefab construction not only saved time but also reduced overall costs, providing great value to the client.
  • Sustainable Practices: Environmentally friendly materials and techniques were used to reduce the carbon footprint of the project.

Sterling Arch is proud to add this multi-story prefab building to our portfolio, showcasing our expertise in innovative construction methods and our commitment to client satisfaction.

GALLERY
PROJECT GALLERY

Captivating, Inspiring, Vibrant

PROJECTS
Other Projects

Innovative, Impactful, Transformative